The necessary work steps naturally depend on the condition of the corresponding component
and can optionally include the following positions:
- Disassembly of the engine
- Cleaning and control of the parts
- Control of the stator winding
- Wash out, dry and paint
- Reconditioning of the clipboard
- Check the plug and connection cable and disassemble and assemble
- Renew of engine mount
- Manufacture of the complete shaft, grooving, pull off and on of the package
- Thread
- Manufacture and adapt the shaft seal collet
- Adaptation of the fan blade
- Reprocess end shield A-side and B-side
- Completely new assembly of the motor and control according to norm VDE
- Purge of the oil pipe
- Dismantling of the old isolation and professional disposal
- Renewal of heat-resistant parts
- New isolation of the air circulation plug
- Process and balance the impeller wheel ready for installation
- Assembly and completely static and dynamic balancing of the air circulation unit
DO YOU HAVE ANY QUESTIONS OR ARE YOU LOOKING FOR A CONTACT PERSON?
WE ARE HERE FOR YOU.
Get in contact